FALCON News
2008.07.25
FALCON ICD Updated
The current FALCON ICD has been posted to the website.
2008.06.11
DNA/Oral Swab Form Posted
Download the form as a PDF.
2008.05.30
Technical Bulletin Posted
Project updates, scheduling and other notes related to the Rapid ID Pilot, Build 2A and the Biometric Workflow Replacement.
2008.04.17
FALCON ICD Updated
The current FALCON ICD has been posted to the website.
2008.02.15
Technical Bulletin Posted
Project updates, scheduling and other notes related to the Rapid ID Pilot, Build 2A and the Biometric Workflow Replacement.
Build 2A ICD Discussion (110.59 kB .doc)
Questions and Answers from the February 6th conference call regarding the FALCON Build 2A ICD.
2008.01.17
FALCON FAQs Posted
Answers to the most frequently asked questions have been posted.
2008.01.07
FALCON ICD Updated
The current FALCON ICD has been posted to the website.
2007.09.14
Technical Bulletin Posted
Project updates, scheduling and other notes related to the Rapid ID Pilot, Build 2A and the Biometric Workflow Replacement.
2007.08.28
RFI #1054 Response Issued
Reply to Vendor Questions issued, including supporting documents.
2007.03.06
RFQ/P #0005 Addendum #10 Issued
An addendum has been issued to the FALCON Build 2A RFQ/P detailing the award of contract.
2006.12.12
FALCON ICD Posted
The current FALCON ICD has been posted to the website.
2006.11.13
RFQ/P #0005 Addendum #9 Issued
An addendum has been issued to the FALCON Build 2A RFQ/P detailing the award of contract.
2006.11.02
RFQ/P #0005 Addendum #8 Issued
An addendum has been issued to the FALCON Build 2A RFQ/P detailing a revised schedule.
2006.10.30
RFQ/P #0005 Addendum #7 Issued
An addendum has been issued to the FALCON Build 2A RFQ/P detailing a revised schedule.
2006.10.20
RFQ/P #0005 Addendum #6 Issued
An addendum has been issued to the FALCON Build 2A RFQ/P detailing a revised schedule.
2006.10.18
Device System Requirements Information
Information regarding the requirements for new/additional FALCON edge devices to be used during the first phase of the FALCON Project (Rapid ID) has been posted.
2006.10.04
RFQ/P #0005 Addendum #5 Issued
An addendum has been issued to the FALCON Build 2A RFQ/P detailing a revised schedule.
2006.09.27
RFQ/P #0005 Addendum #4 Issued
An addendum has been issued to the FALCON Build 2A RFQ/P detailing instructions and format for the Best and Final Offer (BAFO).
2006.09.25
RFQ/P #0005 Addendum #3 Issued
An addendum has been issued to the FALCON Build 2A RFQ/P detailing a revised schedule.
2006.09.08
RFQ/P #0005 Addendum #2 Issued
An addendum has been issued to the FALCON Build 2A RFQ/P detailing changes to the RFQ/P Schedule, final scores, intent to negotiate and instructions for negotiation.
2006.08.22
RFQ/P #0005 Addendum #1 Issued
An addendum has been issued to the FALCON Build 2A RFQ/P detailing a revised schedule, along with instructions and schedule for oral presentations.
2006.08.08
List of Proposing Firms Posted
A list of vendors providing written proposals for the FALCON Build 2A RFQ/P has been posted.
2006.07.18
Vendors Providing Letter of Intent
A list of vendors providing written notice of intent to submit proposals for the FALCON Build 2A RFQ/P has been posted.
2006.07.06
Response to Written Questions
FDLE's response to vendor's written questions about the FALCON Build 2A RFQ/P have been posted.
2006.06.27
Vendor Public Meeting Documents
Attendee list and presentation from the June 23 Vendor Public Meeting available.
2006.05.31
RFQ/P Available
FALCON Build 2A System Integrator documents available for download.
